Floodwood, MN – On Saturday July 10th, water protectors stopped construction for a full day on an Enbridge worksite laying pipe for the Line 3 pipeline. Two water protectors locked to each other through the treads of a machine, while two others climbed up an excavator’s arm, where they stayed for 7 hours. This action took place on Anishinaabe treaty territories in solidarity with leaders of the growing Indigenous-led resistance to Line 3.
As these four water protectors stopped machinery, a large crowd gathered on the roadway in support, drumming, singing, and rallying in the summer heat. About 30 police officers from St. Louis, Carlton, and Aitkin counties responded, as well as State Troopers and a Fond Du Lac Tribal Officer.
The post Water Protectors Shut Down Line 3 Worksite appeared first on PopularResistance.Org.
This post was originally published on PopularResistance.Org.